KMI Zeolite Production Report 2020

Production Report Date & Time *

Raw Ore Loads Into Plant *

Raw Ore In Tons (2.5 ton per load) *

Rerun Ore In Tons (2.5 tons per load)

Rerun Ore Loads Into Plant


Granular Produced (total for the day)

Product Bagged (list all)

Start / Stop Times (list all)

Plant Run Time (total hours) *


Plant Maintenance (Total hours if any)

Plant Maintenance Description

Non-Run Time (Total hours, if any)

Non-Run Time Description

Breakdowns (Total hours if any)

Breakdowns Description


Notes for the day